Contact

Tell us about the building.

Send the engineer-of-record drawings if you have them, or describe the scope. We'll go over the plans, get a material quote from the manufacturer, and walk the site before we send a written, itemized bid.

Start here

Request a bid in about a minute.

What to expect

The owner sees every inquiry, and the response comes directly from Nick: engineering first, hands behind it.

Drawings + site walk

We review the plans and see the job in person before we put a number on it.

Bid to your drawings

Have EOR design intent or a construction set? Send it and we price to the documents.

Licensed B1 contractor

California B1 #960653, building since 2011, statewide.

No obligation

Ask about a seismic standard or a coating system. We’re happy to talk it through.